News and Information

To celebrate the delivery of the mobile platform for the hong kong-macau bridge project

Time:2017 - 09 - 09 Word Size

    The hong kong-zhuhai-macao bridge, as the longest, most invested and most difficult bridge project in China's construction history, has attracted wide attention both at home and abroad. The hong kong-zhuhai-macao bridge will connect the world's most dynamic economic zone, and the completion of the fast track will be of great significance to the economic and social integration of Hong Kong, Macao and zhuhai. The total length of the bridge is 6.7 km, which is the key project of the whole bridge project.

    Should hong kong-zhuhai-macao bridge engineering island tunnel engineering complexes on the special environment of the tunnel wall and top is decorated construction demand, I day yao qi technology service co., LTD. Engineering design and manufacture of six sets of detachable mobile elevating work platform and five flip lift car in July 12, 2016, formally deliver the tunnel construction site use.

    As far as the project itself is concerned, the 33-section caisson of the harbour bridge is 38 meters wide, 11.4 meters high and 7.4 meters clear. The installation of fire prevention board at the top and side wall of the inner wall is faced with a great challenge, because the immersed tube is 7.4 meters, which belongs to the high-altitude operation. Each fire prevention board is 25MM thick and weighs 90kg. It is a high-strength operation and requires a guarantee period.

    Our company by field measurement and engineering personnel to understand the specific requirements of the engineering construction, design and manufacture the dismantling of mobile elevating work platform solves the side wall concrete requirements in construction of fire prevention board, flip the lift car solved at the top of the specific needs of fire prevention board construction. On July 12 the nikkei avic ii tunnel bureau island after acceptance by company organization, tunnel site construction personnel evaluation that our products can not only efficiently help them to complete the construction, but also effectively provides the work high above the security guard, and put forward to our designers and on-site installation personnel.

    Our company specializes in the design and production of all kinds of non-standard equipment for the construction site of each project, to customize the customers, provide the safety and quality assurance, and bring the super cost-effective project construction equipment for the customers. We are willing to work with all engineers to provide a safe and efficient infrastructure for the people.

    Flip up and down car installation

    The tilting trolley is delivered to the undersea tunnel site

    Remove the movable lifting platform installation

    Remove the movable lifting platform installation

18025319287